
Plans for tomorrow
Hotel Donny does everything it can, every single day, to make sure our guests have a comfortable stay.
That’s why we’ve been renovating and modernizing continuously ever since we started in 2012.
We’ll give an overview of examples of finished works, as well as plans for the (nearby) future.
Do not hesitate to share any ideas or inspiration you might have with us!
Done
2012
- the bar
- the reception
- 4 prestige rooms
- swimming pool
- heating installation
- terrace and fire exits
2013
- 3 rooms
2014
- 17 rooms
2015
- 18 rooms
- COnference room Donny
2016
- the 3 remaining rooms: Penthouse suite, Royal suite, family room 314
- EV-Box chariging point
2017
- the restaurant
- facade and ventilation Sanocenter
2018
- 1st fase Heat-recovery system (3rd floor)
- corridors 3rd floor
- Suitepads
2019
- 2de fase of the heat recovery system (1st and 2nd floor)
- corridors 1st and 2nd floor
2020
- Digital lock system for the room doors
- Bathrooms for the junior suites with walk in bath
- bathrooms of 2 family rooms
- renovation wellness: new sauna and steam bath, infra red lamps, shower, toilets, ice machine
2021
- new elevator
2022
- 2nd elevator replacement
- bathrooms
To do
2024
- sonorisation improvements in the restaurant
- private wellness area with infrared cabin and jacuzzi